|
|
<>[ Sun City ] [ TECH RIDER ]
PERFORMANCE
DURATION: 70 minutes
TOURING STAFF
7 Dancers
2 Musicians
2 Technicians
1 Organiser
STAGE
Proscenium width: 10 m (min. 8m.)
Depth: 10m (min. 8m.)
Floor: black / dance floor, no concrete
Wall: we are using an existing wall of the venue as part of the show
Tube / Pipe: we need a metal tube/pipe on the venue 2,70m from the
floor to hold 7 dancers
Sand: we need 50 kg of sand suitable for dancing barefoot on it
# Also possible to perform on round venue (audience seating around in a
circle).
SOUND
- Quality sound system
4 full-range cabinet and 1 bass bin
two stage speaker monitors for musician
two stage speaker monitors for dancers
- 2 proffesional cd players
- Sound board min. 8 chanells, 4 aux sends and 4 groups
- Minimum 1 parametric EQ (mids) on channel beside other eqs.
- 2 channel multi effect processor. Reverbs and delays needed
independently
- DI Box, active (we are using instrument SITAR live)
- Recording stereo device such as minidisc
- All necessary cables and power sockets
LIGHT
- MOVING HEAD (spots – Robe) : 8
- FRESNEL 1 kW + shutter:
12
- PC 1 kW + shutter:
11
- PAR 64 1 kW /CP 60:
6
- PAR 64 1 Kw / CP 61:
16
- PAR 64 1 Kw / CP 62:
7
- PIN SPOTS /PAR 36 – 50 W:
5
(or Profile 575 or 600 W with iris)
- PROFILE 1 Kw with iris:
2
- FLOOD 1 kW + shutter:
2
- HQI 400 W:
2
- Supergel or lee:
135, 136, 137, 162, 200, 202, 205, 234, 219
-Nebelsalz (for fog)
-Small electric cooker for nebelsalz
-Ventilator
SET UP CREW REQUIREMENTS -
LOCAL TEAM
- 1 light technician
- 1 sound technician
- 1 stage technician
SET UP TIME: 2 day ( 1 day
set, next day performance)
- 14 hrs for stage, light, sound
- 2 hrs technical checks
- 4 hrs warm up for dancers before performance
Important:
- That our technician operate sound and light from one position in the
house and not in the control room. The ideal position is middle centre
of the house.
- A signed technical rider from tecnical director of the venue is part
of the contract.
> |
|